1. |
12-Mar-2024 06:00 PM |
19-Apr-2024 02:00 PM |
20-Apr-2024 02:00 PM |
[DEPOSIT WORK- Manneera- Peruvali Water Supply scheme Construction of 6m dia. Intake Well cum pump House G L Sump, Booster Pump Houses, Pressure Filter and distribution Net Works with Over Head Tank at Thalamanam- etc.]
[388/2023-24/KWA/ PHC/TVLA (RT-1)][2024_KWA_669368_1]
|
Kerala Water Authority||Chief Engineer Southern Region (Trivandrum)||Superintending Engineer PH circle Pathanamthitta
|
2. |
24-Feb-2024 06:00 PM |
19-Apr-2024 02:00 PM |
20-Apr-2024 02:00 PM |
[JJM- CWSS to Puramattom, Koipuram and adj. pts Design,construction and commissioning of 4LL capacity OHSR at Nannoor in Eraviperoor panchayath and Laying 200mm DI K9 - CWPM branch line,250mm DI K9 CWPM etc.]
[366/2023-24/KWA/PHC/TVLA(RT-1)][2024_KWA_663457_1]
|
Kerala Water Authority||Chief Engineer Southern Region (Trivandrum)||Superintending Engineer PH circle Pathanamthitta
|
3. |
24-Feb-2024 06:00 PM |
19-Apr-2024 02:00 PM |
20-Apr-2024 02:00 PM |
[JJM - Kurichy Grama Panchayath- Construction 7LL OHSR after demolishing old and damaged OHSR and laying of pumping mains, Distribution mains and allied works. ]
[367/2023-24/KWA/ PHC/TVLA (RT-1) ][2024_KWA_663514_1]
|
Kerala Water Authority||Chief Engineer Southern Region (Trivandrum)||Superintending Engineer PH circle Pathanamthitta
|
4. |
12-Apr-2024 02:00 PM |
19-Apr-2024 02:00 PM |
20-Apr-2024 02:00 PM |
[SUPPLY OF DRINKING WATER]
[SC3 313/2023][2024_DP_671745_1]
|
Directorate of Panchayat||Deputy Director of Panchayaths Idukki||Arakulam Grama Panchayat
|
5. |
11-Apr-2024 04:45 PM |
19-Apr-2024 02:00 PM |
20-Apr-2024 02:00 PM |
[Supply of Forging Quality Steel AISI 410, Size 240 RCS]
[SIFl/PUR/4/408/24-25 dtd 11.04.2024][2024_SIFL_671724_1]
|
Steel and Industrial Forgings Ltd||Works||Materials Management
|
6. |
24-Feb-2024 06:00 PM |
19-Apr-2024 02:00 PM |
20-Apr-2024 02:00 PM |
[JJM - RWSS to Ranni - Pazhavangadi-Construction of OHSR 10 LL and sump at Anapramala,at Anathadam, at Madathumpadi,Toilets, Transformer rooms,Supply and installation of pump set,distribution mains, Aluminium roof,Renovation of intake,Solar panel etc]
[363/2023-24/KWA/PHC/TVLA(RT-1)][2024_KWA_663379_1]
|
Kerala Water Authority||Chief Engineer Southern Region (Trivandrum)||Superintending Engineer PH circle Pathanamthitta
|
7. |
01-Mar-2024 06:00 PM |
19-Apr-2024 02:00 PM |
20-Apr-2024 02:00 PM |
[JJM-5th SWSM- WSS to Mylapra, Malayalappuzha and Vadasserikkara Panchayaths- Design and Construction of 6m dia intake well cum Pumphouse and Raw Water Pumping Main at Maniyar.]
[380/2023-24/KWA/PHC/TVLA (RT-1)][2024_KWA_666217_1]
|
Kerala Water Authority||Chief Engineer Southern Region (Trivandrum)||Superintending Engineer PH circle Pathanamthitta
|
8. |
05-Apr-2024 03:30 PM |
19-Apr-2024 03:00 PM |
22-Apr-2024 03:00 PM |
[Construction of Cochin Cancer Research Centre, Ernakulam (SH Arrangement of Water Supply from KINFRA Hi Tech Park, Kalamassery)]
[NIT/INKEL/KIIFB/2023-24/154 dated 05/04/2024][2024_INKEL_671587_1]
|
INKEL Limited
|
9. |
15-Mar-2024 10:00 AM |
19-Apr-2024 03:00 PM |
23-Apr-2024 11:00 AM |
[Hiring of Lorry 5 tonne and above capacity below 15 years old with driver for the use of Electrical Division Kodungallur]
[10/E/2023-24/ED/KDLR/12.03.24][2024_KSEB_669470_1]
|
Kerala State Electricity Board||Chief Engineer (Distribution Central)||Dpty Chief Engg Electrical Circle Irinjalakkuda||EE Electrical Div Kodungallur
|
10. |
21-Mar-2024 06:30 PM |
19-Apr-2024 03:00 PM |
20-Apr-2024 03:00 PM |
[SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF DG SETS OF 25 KVA (4 Nos) and 12.5 KVA (1 No.) FOR VARIOUS BMC SITES UNDER NPDD_KL_14J]
[MRU/ENGG/DG/T73/2023-24][2024_KCMMF_671230_1]
|
Kerala Co-operative Milk Marketing Federation Ltd||Malabar Regional Co-operative Milk Producers Union Ltd||MRCMPU Ltd. Head Office Kozhikode
|